Capital Engineering System
TGC-2 is connecting capital construction (reconstruction) facilities to centralized heating systems of the following cities: Arkhangelsk, North Provincesk, Vlogda, Kostrom, Jaroslav.
TGC-2 is connecting capital construction (reconstruction) facilities to the heating system by means of a contract to access the heating system.
- Application by the Claimant for the technical conditions of connection to the heating system, specifying the required volume of the load involved and attaching the necessary documents.
The application for the technical conditions of connection to the heat supply system, with the required documents, shall be submitted to the office office or to the postal address of the HK-2 OA in the connection area. (Contact information)
On the basis of an application received within 14 working days of the date of receipt of the OAO, TC-2 defines and provides the technical conditions for connection of the facility to networks Engineering either provides a reasoned waiver.
In the absence of the necessary documents, the Claimant shall, within six working days of the date of receipt of the application, be notified, on the contact details indicated in the application, of the need for missing documents.
- Request by the Claimant for access to the heat supply system with the necessary documents.
The application for access to the heat supply system, accompanied by the required documents, is sent to the office office or to the postal address of the HK-2 OAO in the connection area. (Contact information)
In the absence of the necessary documents, the Claimant shall, within six working days of the date of receipt of the request, be notified, upon the contact details specified in the application, of the need for missing documents to be submitted.
In the event that the applicant fails to provide the necessary documents and information within 3 months of the date of its notification, the TGC-2 OA shall cancel the application for inclusion and notify the applicant within 15 days of the date of the decision to cancel the application.
In the event of the submission of information and documents in full, the GAO TC-2 shall, within 30 days from the date of receipt, send a letter of transmittal or hand to the employer a signed draft contract for inclusion in the required number of copies (depending on the number of parties to the treaty) for consideration and signature.
Related posts:
The owner does not always have the opportunity to build a house on his own accord. The establishment of housing units must be regulated by the authorities, which…
The SVC, Stream Dom, provides all the services immediately, from the design of a house or a cottage project to the building of a house or the construction of a cottage…
If you re going to build your own country house, you re sure you know that before any work is done, it s necessary to define the project. You can create a home project…
Engineering networks and communication are used in each house. People need water, heat, sewerage, electricity for comfort. Engineering networks comprise three types…
For more than 11 years, we have been building wooden houses from the Brew in Ekaterinburg and guaranteeing an optimal price-quality ratio: we are building houses…
In the modern construction market, houses and new technology facilities in the construction of Genesis have been built for a year. The foundation of the buildings…
Mode to wooden houses will never leave, as it is the most environmentally sound material, and the construction of wood houses is much cheaper than bricks. For this…
The Order of the General and Political Department of the Far North of the NKVD of the USSR for the development of the polygraphic base and the streamlining of the…
Our company, LSTCroyGrup, is offering you ready projects based on the LSTC carcas. If you are not prepared to develop and develop a fully future development on your…
The Lad House has been building carcass houses in Irkutsk for over five years. As we use an integrated approach in construction, we are able to significantly reduce…