Capital Engineering System
TGC-2 is connecting capital construction (reconstruction) facilities to centralized heating systems of the following cities: Arkhangelsk, North Provincesk, Vlogda, Kostrom, Jaroslav.
TGC-2 is connecting capital construction (reconstruction) facilities to the heating system by means of a contract to access the heating system.
- Application by the Claimant for the technical conditions of connection to the heating system, specifying the required volume of the load involved and attaching the necessary documents.
The application for the technical conditions of connection to the heat supply system, with the required documents, shall be submitted to the office office or to the postal address of the HK-2 OA in the connection area. (Contact information)
On the basis of an application received within 14 working days of the date of receipt of the OAO, TC-2 defines and provides the technical conditions for connection of the facility to networks Engineering either provides a reasoned waiver.
In the absence of the necessary documents, the Claimant shall, within six working days of the date of receipt of the application, be notified, on the contact details indicated in the application, of the need for missing documents.
- Request by the Claimant for access to the heat supply system with the necessary documents.
The application for access to the heat supply system, accompanied by the required documents, is sent to the office office or to the postal address of the HK-2 OAO in the connection area. (Contact information)
In the absence of the necessary documents, the Claimant shall, within six working days of the date of receipt of the request, be notified, upon the contact details specified in the application, of the need for missing documents to be submitted.
In the event that the applicant fails to provide the necessary documents and information within 3 months of the date of its notification, the TGC-2 OA shall cancel the application for inclusion and notify the applicant within 15 days of the date of the decision to cancel the application.
In the event of the submission of information and documents in full, the GAO TC-2 shall, within 30 days from the date of receipt, send a letter of transmittal or hand to the employer a signed draft contract for inclusion in the required number of copies (depending on the number of parties to the treaty) for consideration and signature.
Related posts:
Today, on a business Monday at the mayors office, the new chief of construction permits, the 29-year-old Nail Galeev. The former head of Albert Salihovs office…
Terrasa is a site attached to the house or standing separately. It usually resembles a big porch that connects to the wall at the entrance to the house. In southern…
It s a shame you can t buy a land area and start building your house immediately. In todays world, this requires documents that are properly documented. Before the…
Many have now begun to build different baths on their plots, which are largely different from the traditional Russian version. The owners of their siege try to find…
In 1985, Kabardino-Balkar State University, Engineering, Industrial and Civil Engineering, and Construction Engineers Specialty. In 1, the Oslo Institute of Economics…
Liana has built housing and public buildings since 2003. In our power, the construction of buildings and houses of any difficulty, including multi-ethnic buildings…
Expanded expert council meeting onLegal support for the development of construction materials, machinery and equipment industriesThe extended meeting of the Expert…
If you want to build a low-cost house in Moscow or any other region of Russia for seasonal or permanent residence, and you wish it to be built as soon as possible…
As a result of the separation assessment, the quality of the external and internal separation work performed shall be determined: Determination of the causes of…
The high height of the pipe intended for the removal of smoke gases from two boilers of the power generation plant will significantly reduce the pressure on the…