Construction Of Substations
Electrical substations are an integral part and key equipment of the modern energy system. The installation of substations relates to the most responsible stages of electrification of any facility. The quality of the equipment used and the professionalism of the workshops will depend on the reliability, integrity and productivity of the energy system. Therefore, only specialized organizations should trust such a complex area of work.
Priorities for cooperation with the Inženiring group
The construction of power stations, their refurbishment, modernization, installation and installation of electrical installations are a range of engineering solutions that require a systemic approach and a high level of skills at each stage of operation. For customers, this service is very convenient and practical when one organization can carry out the full range of complex engineering work under the key.
The Inženiring group offers various forms of ownership to government structures and enterprises of the entire range of professional services, which include: design, supply of equipment, construction and installation. The station, its type and technical characteristics are selected for the customer by company specialists on a case-by-case basis, taking into account the technical and operational characteristics of the facility. The extensive work experience and the availability of its own production base enable the Inženiring PO to perform the installation as soon as possible, ensuring savings in the employer ' s funds and time.
First stage - preparatory work
Full construction and the reconstruction of substations takes place in two stages. Before the equipment is delivered, all construction and engineering works are completed:
- Preparation of a basement or building blocks
- Preparation of telecommunications tranches for the laying of landing, power and control cables
- Establishment of a substation fence
- Construction of sub-standards and construction of anchorages for approved technology
- Electrical installation, lighting and ventilation
- Divisional work
Additional activities are carried out to protect systems and equipment from significant temperature, humidity, groundwater and pollution.
Related posts:
For the first half of 2016 The Mosgostronaut survey, according to its website, has issued 745 construction permits, with a total area of 7,54 million square metres…
The SVC, Stream Dom, provides all the services immediately, from the design of a house or a cottage project to the building of a house or the construction of a cottage…
There are two of them, and they have been mentioned above. The receipt of a loan for the initial construction of dwellings ensures that you are independent of developers…
Engineering networks and communication are used in each house. People need water, heat, sewerage, electricity for comfort. Engineering networks comprise three types…
Many have now begun to build different baths on their plots, which are largely different from the traditional Russian version. The owners of their siege try to find…
In the modern construction market, houses and new technology facilities in the construction of Genesis have been built for a year. The foundation of the buildings…
Mode to wooden houses will never leave, as it is the most environmentally sound material, and the construction of wood houses is much cheaper than bricks. For this…
The importance of literate design of a house from a cylindrobed brawn is that any construction, whether a suburban cottage, delivery, bath or conversation, begins…
Today, 19 July, the department of Elvira Nabiullinas non-existent office withdrew the Banks licence to carry out bank transactions at the Capital Credit and Credit…
The owner does not always have the opportunity to build a house on his own accord. The establishment of housing units must be regulated by the authorities, which…